Staff Performance is a general summary of recorded work data related to shifts, work hours, attendance, break, and miscellaneous details.
This can be accessed in the Staff Members page from the left navigation pane.

NOTES:

Available Performance Data

These are the list of performance staff data:

Shift Summary
- Summary for past scheduled shifts (does not consider any unpublished shifts) within the selected Date Period
Work Hours Summary
- Summary for past recorded actual work hours (excluding breaks) in scheduled shifts and timesheet records within the selected Date Period
Attendance Summary
- Summary for past recorded Clock In against actual Shift Start (with 15 minutes allowance) within the selected Date Period
Break Hours Summary
- Summary for past recorded break hours in scheduled shifts and timesheet records within the selected Date Period
Miscellaneous
- Summary for other additional past data within the selected Date Period

Viewing an Individual Staff Performance Data

NOTE: This requires that there is at least 1 staff in current business.
  1. Open Staff Profile by doing any of the following:
  2. On the Staff Profile, click on Performance tab.
  3. To adjust visible performance period, select a date period in the pulldownlist beside the Performance Summary For text. Or optionally, Custom can be selected which will require manual entry of start/end dates, as well as clicking on the Apply button.
    NOTE:
    - Only past data for the selected date range will be shown. So data on current and future dates will be excluded.

Viewing All Staff Performance Data

NOTE: This requires that there is at least 1 staff in current business.
  1. Go to Staff Members page from the left navigation pane.
  2. Click on Performance Tab.
  3. To adjust visible performance period, select a date period in the pulldownlist beside the Performance Summary For text. Or optionally, Custom can be selected which will require manual entry of start/end dates, as well as clicking on the Apply button.
    NOTE:
    - Only past data for the selected date range will be shown. So data on current and future dates will be excluded.